On the sand or on the site, dropped the day you bookedOne flat price, quoted on the callServicing and restock ride with the rental
Huntington Beach Porta Potty emblemHuntington BeachPorta Potty Call for a quote(562) 393-6380

Planner

How do I work out the unit count for my job or event?

Four rungs down the ladder and the ticket at the bottom fills itself. The ratios are the standard ones — OSHA for job sites, the working industry figures for events.

(562) 393-6380

Mon-Sat 4am-4pm

Answer these

Four questions

1
What is it? The ratio changes completely between the three.
2
Workers on site, or guests through the gate.
3
Longer runs push the count up, to a point.
4
Anything else true? Both of these change the answer.
What to book
5Restrooms 1Accessible 2Hand-wash

Put a headcount in and the numbers fill themselves.

These are planning numbers, not a quote. Read them out on the phone and we will sanity-check them against the site.

Still deciding

Not sure which unit, rather than how many?

The other planner walks the branches from what the job is to which unit fits, and puts the full spec ledger underneath it.

Pick a unit

How this works

About the numbers

What are these ratios based on?
The job-site figure is the OSHA sanitation table: one unit per ten workers on a forty-hour week. The event figures are the working industry ratios over a four-hour window — one per hundred and ten at a party, one per ninety-five at a wedding, one per eighty-five at a festival — stretched by duration up to one and a half times, with a quarter added when there is a bar.
When the number is not whole, do I go up or down?
Up, always. A second unit costs a fraction of what a line costs you, and on a permitted event the reviewer is checking a minimum rather than an average.
Does the calculator account for accessible units?
Yes — one per eight standard units, with at least one on any event open to the public. Tick the public box and it holds that floor.
What about hand-wash stations?
One per three restrooms. If you have food vendors, the health department will want provision per vendor row instead, so call and we will work it properly.
Is a two-shift job site double the units?
No — same unit count, double the servicing. The stalls are getting twice the traffic between visits, not twice the simultaneous demand.
Can I just tell you the headcount instead?
Please do. Two minutes on the phone gets you a number and a price at the same time.

Got your count?

Read it out and we will price it, or describe the job and we will do the counting.

Call now(562) 393-6380